Today the custom made walnut cabinets began to be installed in the kitchen.
Albert is doing some last minute patching on the floor where the stove will be placed.
Gary the cabinet maker also does his own installing. This cabinet is where the kitchen sink will be placed.
A dishwasher will be in the first cabinet, then the sink, followed by a three drawer set. The lower drawers will be finished tomorrow, however the doors will not be installed for a few more days.
No comments:
Post a Comment