Monday, October 24, 2011

Up in the Air

I just put all the pictures on the blog today.  It was quite facinating watching the process.

Here is a picture of the I-beam and cribbing with one of the four jacks.

This jack outside was supporting the tacked on wash room, entry way.  The rim joists were totally rotten so it was necessary to support the house above the floor of this addition.





Here is the southwest corner that left the outside support on the footing.











Posted by Picasa

No comments:

Post a Comment