Tuesday, November 1, 2011

Binary Day (foundation cont.)

18 inch forms for the foundation were put in today all around the house.

Two lengths of rebar to reinforce the concrete were also laid in.  They will be tied 6 inches down from the top of the foundation so as to float in the cement as it hardens into concrete.

All of this work being done to replace that rock holding up a block holding up a log holding up the house! (posted 10/19)

Posted by Picasa

No comments:

Post a Comment