Wednesday, November 16, 2011

Walls are finally poured!

The pump truck and cement truck arrived and the rain held off.



The walls are filled up to the correct line.  This was done by snapping a line on the outside of the forms, then small nails are placed along the line and through the form to the desired level of the concrete.  The concrete is then poured up to that level.

Below photo is the concrete being poured into a hopper from which it will be pumped and poured into the walls.



Posted by Picasa